---
title: "Sewer Lateral Certificate in Piedmont: Selling a Home"
description: "What Piedmont home sellers and buyers need for the EBMUD private sewer lateral Compliance Certificate to close escrow."
canonical: https://eastbaysewerinspection.com/city/piedmont/
---

[Home](https://eastbaysewerinspection.com/) › [Cities](https://eastbaysewerinspection.com/cities/) › Piedmont

# Sewer lateral certificate when selling in Piedmont

**Quick answer:** **Do I need a sewer lateral certificate to sell in Piedmont?** Yes, if the property is an EBMUD wastewater customer in Piedmont. Piedmont is covered by the EBMUD Regional PSL Ordinance for escrows opened on or after August 22, 2011, so a Compliance Certificate (or an exemption or Time Extension Certificate) is needed to close escrow. A contractor repairs or replaces the lateral, then EBMUD witnesses a verification (leak) test. A CCTV video alone is not enough.

Piedmont is covered by the EBMUD Regional PSL Ordinance. It applies to escrows opened on or after **August 22, 2011**. Only EBMUD wastewater customers in the program area are covered, so check your parcel with EBMUD.

* **Trigger:** a Compliance Certificate is **required to close escrow** when buying or selling, and also for building or remodeling over $100,000 (at final permit sign-off) or changing water meter size ([EBMUD](https://www.ebmud.com/wastewater/private-sewer-laterals)).
* **Test, not video:** a contractor usually runs a CCTV inspection and repairs or replaces the lateral, then sets up a verification (leak) test witnessed by EBMUD. A CCTV video alone is not enough.
* **Need more time?** A Time Extension Certificate gives 180 days after issue to finish the work. It needs a fee plus a **$4,500 refundable deposit**.
* **Exemptions** include properties on septic, fully pressurized laterals, no connected lateral, title transfers not subject to the ordinance, and valid Alameda/Albany certificates.
* **HOAs/condos** had to certify laterals they maintain by July 12, 2021. Buyers should ask the HOA for its Statement of Responsibility.
* **Appeals** within 30 calendar days.

Local permits: Piedmont may require its own sewer or plumbing permit for lateral repair or replacement. Check with the city.

[Full program guide →](https://eastbaysewerinspection.com/ebmud-psl-program/) · [Cost estimates](https://eastbaysewerinspection.com/sewer-lateral-cost/) · [Finding a contractor](https://eastbaysewerinspection.com/contractors/)

Data last verified 2026-10-12 against EBMUD and Regional PSL program pages.

<!-- ebmud-list:start -->
## Which contractors on EBMUD's list are based in Piedmont?

None of the 41 contractors we list from EBMUD's PSL contractor list (August 2026) has a business address in Piedmont. EBMUD doesn't publish service areas, so contractors based in nearby cities may work here: [see all 41](https://eastbaysewerinspection.com/contractors/).

EBMUD publishes this as a *courtesy list*: contractors volunteered to be on it and self-certified the services they provide. It is not an exclusive list and EBMUD does not endorse anyone. EBMUD also keeps a separate list of contractors who are currently **ineligible** to do PSL inspections; check eligibility with EBMUD before you hire. Source: [EBMUD PSL Program Contractor List](https://www.eastbaypsl.com/doc/ContractorList.pdf), retrieved 2026-10-30; licenses checked against CSLB's License Master file (2026-10-28).
<!-- ebmud-list:end -->

## Getting the certificate in Piedmont

1. Check the property's PSL status on [eastbaypsl.com](https://www.eastbaypsl.com/).
2. Get written bids from two or three contractors on EBMUD's list (above, or [all 41](/contractors/)).
3. Your contractor inspects, repairs or replaces the lateral, pulls any city permit and schedules the EBMUD-witnessed verification test.
4. Pass the test, download the Compliance Certificate and give it to escrow.

[Find a contractor](https://eastbaysewerinspection.com/contractors/)


Get free quotes: https://eastbaysewerinspection.com/quotes/ sends one request to up to 3 sewer lateral contractors on EBMUD's PSL contractor list (active CSLB licence) near you. Free, no obligation.

## Frequently asked questions

**Do I need a sewer lateral certificate to sell in Piedmont?**

Yes, if the property is an EBMUD wastewater customer in Piedmont. Piedmont is covered by the EBMUD Regional PSL Ordinance for escrows opened on or after August 22, 2011, so a Compliance Certificate (or an exemption or Time Extension Certificate) is needed to close escrow. A contractor repairs or replaces the lateral, then EBMUD witnesses a verification (leak) test. A CCTV video alone is not enough. ([EBMUD](https://www.ebmud.com/wastewater/private-sewer-laterals), [eastbaypsl.com](https://www.eastbaypsl.com/))

**Which contractors on EBMUD's list are based in Piedmont?**

None of the 41 contractors we list from EBMUD's PSL contractor list (August 2026) has a business address in Piedmont. EBMUD doesn't publish service areas, so contractors based in nearby cities may work here: [see all 41](https://eastbaysewerinspection.com/contractors/). Source: [EBMUD PSL Program Contractor List](https://www.eastbaypsl.com/doc/ContractorList.pdf).

**Is a CCTV camera inspection enough to get the certificate?**

No. A contractor usually runs a CCTV inspection and repairs or replaces the lateral, then sets up a verification (leak) test witnessed by EBMUD. A CCTV video alone is not enough. ([EBMUD](https://www.ebmud.com/wastewater/private-sewer-laterals))

**What if the work can't be finished before closing?**

A Time Extension Certificate gives 180 days after issue to finish the work. It needs a fee plus a **$4,500 refundable deposit**. ([fees](https://eastbaysewerinspection.com/sewer-lateral-cost/))

**Which properties are exempt?**

Exemptions include properties on septic, fully pressurized laterals, no connected lateral, title transfers not subject to the ordinance, and valid Alameda/Albany certificates. ([EBMUD](https://www.ebmud.com/wastewater/private-sewer-laterals))

## Which other East Bay cities require a sewer lateral certificate?

Oakland, Alameda, Albany, Emeryville, Piedmont, El Cerrito, Kensington and Richmond Annex are in the EBMUD Regional PSL program. Berkeley runs its own separate program.

[Oakland](https://eastbaysewerinspection.com/city/oakland/) · [Alameda](https://eastbaysewerinspection.com/city/alameda/) · [Albany](https://eastbaysewerinspection.com/city/albany/) · [Emeryville](https://eastbaysewerinspection.com/city/emeryville/) · [El Cerrito](https://eastbaysewerinspection.com/city/el-cerrito/) · [Kensington](https://eastbaysewerinspection.com/city/kensington/) · [Berkeley](https://eastbaysewerinspection.com/city/berkeley/)

## Guides

[How the EBMUD program works](https://eastbaysewerinspection.com/ebmud-psl-program/) · [Costs](https://eastbaysewerinspection.com/sewer-lateral-cost/) · [Finding a contractor](https://eastbaysewerinspection.com/contractors/)
